Montreal · Laval · Longueuil · Residential & Commercial · Since 2010

After Builders Cleaning in Montreal — From Construction Site to Move-In Ready

Your project is finished — but what builders leave behind is more hazardous than it looks. Fine construction dust, chemical residues, adhesive and silica particles require HEPA-grade equipment and specialist expertise to remove safely and completely.

Get My Free Quote →

After Builders Cleaning Services

Why this isn’t just “a big clean”

What Construction Teams Leave Behind — And Why It Matters for Your Health

After any renovation or new construction, what remains is more complex than surface debris. Construction sites generate crystalline silica dust from concrete, drywall and masonry — particles fine enough to penetrate deep lung tissue. This is a genuine health hazard recognized by CNESST Quebec, not merely visible grime.

Beyond silica, post-construction environments contain VOC off-gassing from fresh paint and adhesives, grout haze on new tile, adhesive residue on floors, paint splatter on hardware, and protective films left by installers. All of these require specific chemical solvents and techniques.

The Montreal Cleaners has specialized in after builders cleaning since 2010. Our teams use HEPA-filtered vacuums (0.3-micron capture), N95 respirators, and a systematic 3-phase approach that ensures complete removal.

Free on-site assessment — we evaluate the scope before providing a transparent quote. Request a quote →

2010

Specializing in
post-build cleaning

HEPA

0.3-micron particle
capture standard

3

Phase systematic
process on every job

7/7

Morning, evening
or overnight

⚠️ Health Warning — Crystalline Silica Dust

Cutting, grinding or sanding concrete, masonry and drywall releases crystalline silica particles — some as small as 0.5 microns, invisible to the naked eye. According to CNESST Quebec, prolonged inhalation causes silicosis, an irreversible progressive lung disease. Never allow children, elderly individuals or immunocompromised people to occupy a newly renovated space before professional post-construction cleaning is complete.

Our systematic approach

The 3-Phase After Builders Cleaning Process

After a projet has been completed, there is generally a great deal of the site cleaning. The building needs to be ready for the opening. It has to look especially sparkling and inviting. Do not miss the first impression !

Our Montreal maids cleaners are fully equipped to provide you with high quality cleaning service. We can provide you after building work cleaning in the morning, afternoon, evening or the night.
Our cleaners work to a pre-agreed list or use own judgement. On all sites, The Montreal Cleaners view health and safety in the up most importance. Our cleaning lady and housekeepers have years of experience and we offer our services at reasonable prices.

Our clients are 100% satisfied with the results and quality.

Every phase must be completed in sequence — skipping phases compromises safety and leaves hazardous materials behind.

Phase 1 — Rough Site Clearance

  • All debris, packaging and waste removed
  • All protective coverings and tape stripped
  • Initial HEPA vacuum: ceilings, walls, vents, ledges
  • Window tracks and frame debris cleared
  • HVAC return grilles initial clean

Phase 2 — Detail & Surface Work

  • HEPA vacuum all surfaces including high areas
  • Adhesive, paint and caulk removal — chemical specific
  • Grout haze treatment on new tile
  • Interior cabinet and drawer cleaning
  • Door frames, sockets, switches, baseboards
  • Interior glass cleaning streak-free

Phase 3 — Final Prep & Handover

  • Bathrooms and kitchen deep clean
  • Floor wash, polish or wax as needed
  • Final damp-wipe all horizontal surfaces
  • Mirror and glass polishing streak-free
  • Client walkthrough and quality check
  • Touch-up any identified areas

Transparent pricing

After Builders Cleaning Cost in Montreal and Quebec

Property Type Size Estimated Price Duration
Small apartment (1–2 BR) 500–900 sq ft $250–$450 3–5 hours
Mid-size condo (3 BR) 900–1,500 sq ft $400–$650 5–8 hours
Single-family home 1,500–3,000 sq ft $600–$1,200 8–12 hours
Commercial office/retail 2,000–10,000 sq ft $800–$4,000 1–2 days
Kitchen or bathroom only N/A $180–$350 2–4 hours

Client results

Trusted by Homeowners, Contractors & Developers

“After our kitchen renovation in Boucherville, plaster dust was everywhere — inside drawers, on cabinets, in the light fixtures. The Montreal Cleaners sent a 3-person team. One day later, the house was completely habitable. Incredible work.”

Christine M. — Homeowner, Boucherville

“We built a 3-floor office in Laval. The Montreal Cleaners handled all post-construction cleaning. Perfect results — building was ready for tenants in exactly 2 days as promised. I’ve used them for 3 projects now.”

Richard P. — Real Estate Developer, Laval

“Bathroom renovation in my Plateau condo left cement dust and grout residue everywhere. They cleaned in a few hours. The tile gleamed like it was installed yesterday. Professional team, remarkable results.”

Olivier L. — Condo Owner, Plateau-Mont-Royal

📍 Greater Montreal Coverage

Montreal, Laval, Longueuil, North Shore, South Shore, Quebec, Lévis, Blainville, Brossard, Boucherville, Gatineau, Ottawa, Outaouais, Châteauguay, Griffintown, Bonaventure, Plateau Mont-Royal, Vieux-Montréal, Terrebonne, Saint-Eustache, Boisbriand, Île-des-Sœurs, Repentigny, Rivière des Prairies, Pointe-aux-Trembles, Westmount, Saint Sauveur, Sainte-Thérèse, Candiac, Saint-Bruno-de-Montarville, Hampstead, Verdun, Outremont, Granby, Montérégie, Sherbrooke, Estrie, LeGardeur, Lachenaie, Deux-Montagnes, Sainte-Rose, Laval sur le Lac, Auteuil, Chomedey, Duvernay, Fabreville, Ste-Dorothée, St-François, Vimont, Pont-Viau, Saguenay, Mauricie, Trois-Rivières, Lanaudière, Baie-d’Urfé, Beaconsfield, Côte-Saint-Luc, Dollard-des-Ormeaux, Dorval, L’Île-Perrot, Montréal-Est, Montréal-Ouest, Mont-Royal, Pointe-Claire, Sainte-Anne-de-Bellevue, Gracefield, Maniwaki, Thurso, Alma and the surrounding regions

Frequently asked questions

FAQ — After Builders Cleaning Montreal

How is after builders cleaning different from regular deep cleaning?

After builders cleaning addresses construction-specific residues: grout haze, adhesive residue, paint splatter, HEPA-level fine silica dust, protective film removal. These require different equipment, different chemical solvents and a systematic process. Regular deep cleaning maintains a lived-in space; after builders cleaning makes a construction site safe for habitation.

How soon after construction should I book cleaning in Montreal?

Immediately after contractor sign-off — ideally within 24–48 hours. Fine construction dust settles deeper into porous surfaces, HVAC systems and hidden spaces the longer it sits. Schedule your clean before your project ends, not after. Last-minute bookings in Montreal’s active construction market can mean a 1–2 week wait.

Are you available on weekends and evenings in Montreal?

Yes — 7 days per week, morning, afternoon and evening slots are available. For commercial projects, we recommend evening or weekend scheduling to minimize disruption. For residential projects, we coordinate around building access requirements for condominiums.

What’s the cost of after builders cleaning in Montreal ?

A 2-bedroom apartment typically runs $250–$450; a condo $400–$650; a family home $600–$1,200. Commercial projects are quoted on site. All pricing is established after a free on-site assessment — no commitment required.

Start with a Clean Slate — Book Your Free Assessment

We visit your site, assess the scope, and provide a transparent quote. Most bookings confirmed within 24 hours. Available morning, evening or overnight.

Request My Free Quote →

Phone: 1-833-800-3330  ·  contact@themontrealcleaners.ca